HOW TO SOLVE THE BLOCKAGE OF THE HIGH-PRESSURE FOAMING MACHINE?

Publish Time: 2021-03-04     Origin: Site

If the multi-functional high-pressure foaming machine is blocked, operate according to the following three points:

1. If you find that there is cement slurry in the mixer of the multifunctional high-pressure foaming machine, you need to think of ways to restore the normal operation of the mixer or discharge the cement slurry in time according to the actual situation.



2. Regarding the foam concrete slurry in the pipeline, it needs to be removed within 4 hours. If the time is too long, it will cause the direct blockage of the foamed cement pipeline, which will affect the normal operation of the multifunctional high-pressure foaming machine. use.

3. A water pump can be used to connect the water pipe and the machine pipe. The water pumped out by the water pump can clean the foam concrete slurry in the pipe of the multifunctional high-pressure foaming machine, so that the foam concrete slurry in the equipment can be cleaned. clean.


Hightop Group's Love Donation Warms Jining Children's Welfare Institution

What is a two-component sprayer?

Polyurethane science and technology] Polyhexyl ester liquid reaction molding advantages

Polyurea spraying equipment compared to manual hand brush construction advantages

Difference between polyurethane coating and polyurea coating